Engineering Services Type B Quarterly Project Report (26-0563)

View full legal title

Engineering Services Type B Quarterly Project Report

inactive
site_specificCorpus Christi B Corporation - Type B
A quarterly report on engineering services projects funded through the Type B economic development corporation was presented for review. It was filed with the City Secretary at one hearing and appeared on a later agenda, but the matter showed no further activity afterward.
2 eventsFirst seen Apr 20, 2026Last activity May 18, 2026File #: 26-0563
Topics
governance

Get notified on new hearings, votes, or status changes for this matter.

Actions

Showing all 3 actions. Filter by: , , .

Developer
As of May 2026

Verify Bear Lane road project is design only

Context: Director of Engineering Services Jeff Edmonds's May 18, 2026 quarterly update listed Bear Lane (SPID to Joe Mireur Rd.) with the explicit qualifier "(Design Only)," unlike Huntwick Avenue, McCampbell, William Drive, and Industrial Park Roadway Improvements.

Recommended: The Bear Lane segment from SPID to Joe Mireur Road was reported to the Type B board as design only, so no construction schedule is on the record — confirm that status with Engineering Services before you tie site access, phasing, or frontage improvements at that segment to a paving completion date. If you assume construction is funded, your access plan may sit unbuilt through the next reporting cycles.

Source: Corpus Christi B Corporation - Type B — May 18, 2026 →
Journalist
As of May 2026

Request slides behind Type B quarterly project update

Context: The Engineering Services Type B Quarterly Project Report was filed with the City Secretary on April 20, 2026 and presented on May 18, 2026, but Item 7 shows a 0-0 result with the note "Presentation only; no motion or vote taken" and no figures in the minutes.

Recommended: Ask the City Secretary for Jeff Edmonds's presentation materials and the report filed April 20, and for the prior quarter's version of the same report — the minutes name eight projects but record no cost, schedule, or percent-complete figures, so slippage between quarters is invisible in the public record. Without the underlying deck you cannot tell which of the eight are behind, and the next quarterly update will overwrite the comparison.

Source: Corpus Christi B Corporation - Type B — May 18, 2026 →
Resident
As of May 2026

Find out if your street project funds construction

Context: Jeff Edmonds's May 18, 2026 quarterly update to the Type B board listed these street projects together, with only Bear Lane (SPID to Joe Mireur Rd.) marked "(Design Only)."

Recommended: If you live along Huntwick Avenue, McCampbell between Agnes and Leopard, William Drive between Rodd Field and Lexington, or Bear Lane, ask Engineering Services which stage your street is in — Bear Lane was reported as design only, meaning surveying and plan work rather than paving and lane closures. Knowing the stage tells you whether to expect construction traffic this year or a design phase with no visible work.

Source: Corpus Christi B Corporation - Type B — May 18, 2026 →

Timeline

Hearing
Filed with the City Secretary

President Summers referred to Item 7. Director of Engineering Services Jeff Edmonds presented the Engineering Services Quarterly Project Updates. Mr. Edmonds presented the following projects: Huntwick Avenue - South Staples to Pavement Change; Industrial Park Roadway Improvements; McCampbell (Agnes to Leopard) Project; Bear Lane (SPID to Joe Mireur Rd.) (Design Only); William Drive (Rodd Field to Lexington Road); Harbor Playhouse Building and HVAC System Improvements; Floodwall Upgrades at Science Museum; Seawall Capital Repairs. Mr. Edmonds responded to board questions.

Vote: 0 for, 0 against

Presentation only; no motion or vote taken

Hearing
Filed with the City Secretary

Engineering Services Type B Quarterly Project Report