A wastewater infrastructure project in Fort Worth's far north that will construct a lift station with 3 million gallon-per-day capacity and associated gravity and force mains to transport wastewater. The project serves the Bonds Ranch corridor area draining toward Eagle Mountain Lake and supports growth in the region.
2 eventsLast active Tracked since $13.0M city spending

Mention Frequency

Topic Distribution

Topics

utilities (3)
development (3)
contract (1)
bond (1)

Roles

mentioned (3)
View network map

Loading network map…

Activity Timeline

April 2026

Land Consent

Authorizes the city to accept approximately 0.997 acres of real property in fee simple from MM Rio Claro 620 LLC on West Bonds Ranch Road for the Bonds Ranch Lift Station, Force Main, and Gravity Main Project.

(CD 7) Authorize Acceptance of 0.997 Acres in Fee Simple Interest of Real Property Owned by MM Rio Claro 620 LLC, Located at West Bonds Ranch Road, in the R. Ganzara Survey, Abstract Number 563, City

Land Consent

Authorizes the city to accept approximately 1.189 acres of real property in fee simple from MM Bonds 836, LLC for the Bonds Ranch Lift Station, Force Main, and Gravity Main Projects.

(CD 7) Authorize Acceptance of Approximately 1.189 Acres in Fee Simple Interest of Real Property Owned by MM Bonds 836, LLC, Located in the Y. Samora Survey, Abstract No. 1385 and the J. Crofford Surv

March 2026

Award Of Contract Consent

Authorizes a $12,992,000 construction contract with CLW Water Group, LLC and a $520,000 engineering amendment with Freese and Nichols, Inc. for the Bonds Ranch Lift Station, Force Main and Gravity Main Project, along with a resolution expressing intent to reimburse expenditures with future debt proceeds and capital improvement appropriations.

(CD 7 and ETJ) Authorize Execution of a Contract with CLW Water Group, LLC in the Amount of $12,992,000.00 for Construction of the Bonds Ranch Lift Station, Force Main and Gravity Main Project Part 1,

$13.0M