Brown and Caldwell
organization
1 mention across 1 event
1 eventLast active Tracked since $3.0M city spending
Topics
utilities (1)
contract (1)
Roles
vendor (1)
Related Entities
Activity Timeline
April 2025
Consent Agenda
vendor
Authorization of a professional services contract with Brown and Caldwell for engineering services related to a chemical optimization and corrosion control study of the City of Dallas water treatment and distribution system, not to exceed $3,042,487.
Authorize a professional services contract with Brown and Caldwell to provide engineering services associated with a chemical optimization and corrosion control study of the City of Dallas water treat
$3.0M