Trinity Strand Hi-Line Span Bridge and Trail Project
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
View network map
Loading network map…
Activity Timeline
March 2025
Authorizes an engineering services contract with Raba Kistner, Inc. for material testing and construction observation services for the Trinity Strand Hi-Line Span Bridge and Trail Project at 1998 Hi-Line Drive, financed through the Design District TIF Fund.
Authorize an engineering services contract with Raba Kistner, Inc. to provide material testing and construction observation services for the Trinity Strand Hi-Line Span Bridge and Trail Project locate
February 2025
Authorizes a construction services contract with The Fain Group, Inc. (lowest of six bidders) for the Trinity Strand Hi-Line Span Project, a new pedestrian bridge at Hi Line Drive in the Dallas Design District connecting the Circuit Trail, Katy Trail, and Trinity Strand Trail.
Authorize a construction services contract for the construction of the Trinity Strand Hi-Line Span Project, a new pedestrian bridge at the end of Hi Line Drive in the Dallas Design District, to connec
Preview of an upcoming agenda item for a construction services contract with The Fain Group, Inc. to build the Trinity Strand Trail Hi-Line Span Project, funded through the Design District TIF District.
Upcoming Agenda Items: February 12, 2025: Construction Services Contract with The Fain Group, Inc. for construction of the Trinity Strand Trail Hi-Line Span Project (Design District TIF District) [Tam