Case File 26-0494
View full legal title
Ordinance accepting $136,250.00 for an increase in the STD/HIV-DIS Prevention Services Program Grant from the Texas Department of State Health Services (DSHS) to provide STD/HIV prevention and control services during the grant period of March 1, 2026, through November 30, 2026; and appropriating the funds in the Health Grants Fund.
Get notified on new hearings, votes, or status changes for this matter.
Actions
Showing all 5 actions. Filter by: , , , , .
Check District 1 wastewater contract for bid-threshold compliance
Context: The wastewater design contract amendment for District 1 carried 9-0 on consent on both April 14 and April 28, 2026, with no recorded discussion of amendment authority.
Recommended: This $502,605 design contract amendment passed twice on consent with zero public discussion — pull the original contract to confirm the amendment stayed within its authorized ceiling rather than triggering a competitive-bid requirement that was bypassed.
Monitor District 1 wastewater design contract for bid opportunity
Context: The wastewater infrastructure design contract amendment for District 1 passed 9-0 on April 28, 2026, ahead of a likely future construction solicitation.
Recommended: Get on the public works notification list now — design contracts like this $502,605 District 1 amendment are typically followed by a separate construction bid package once the design phase wraps.
Ask about capacity scope in District 1 wastewater design
Applies if: you have a pending project in District 1 requiring a new wastewater connection
Context: Council authorized $502,605 for wastewater infrastructure design work in District 1 on April 28, 2026, a phase that fixes capacity specs ahead of construction.
Recommended: If you have a project in District 1 needing a wastewater connection, contact the design consultant now — trunk and pipe sizing decisions get locked in during this design phase, before the $502,605 contract converts to a construction bid.
Investigate downtown hotel permit and incentive discrepancies
Context: Two Mayor-initiated items at this meeting flagged unresolved reporting discrepancies tied to building permit, ADA, and incentive filings for two unnamed downtown hotels.
Recommended: Council took up two Mayor-initiated items examining reporting discrepancies in building permit, accessibility, and incentive-program filings for two downtown hotel projects — file a records request for the underlying staff memos to identify which two projects and what the discrepancies actually are.
Lobby council on tabled citywide water restriction ordinance
Context: Council tabled the Level 1 Water Emergency curtailment ordinance, leaving it pending while nine other items worth $7.6 million moved unanimously on consent.
Recommended: The Level 1 Water Emergency curtailment ordinance was tabled rather than voted up or down — the only non-routine outcome at this meeting — so reach individual council members now, before it reappears and gets fast-tracked through consent like everything else on this agenda.
Timeline
Ordinance accepting $136,250.00 for an increase in the STD/HIV-DIS Prevention Services Program Grant from the Texas Department of State Health Services (DSHS) to provide STD/HIV prevention and control services during the grant period of March 1, 2026, through November 30, 2026; and appropriating the funds in the Health Grants Fund.
Vote: 9 for, 0 against
accept $136,250.00 increase for STD/HIV-DIS Prevention Services grant (second reading)
Ordinance accepting $136,250.00 for an increase in the STD/HIV-DIS Prevention Services Program Grant from the Texas Department of State Health Services (DSHS) to provide STD/HIV prevention and control services during the grant period of March 1, 2026, through November 30, 2026; and appropriating the funds in the Health Grants Fund.
Vote: 9 for, 0 against
accept $136,250 increase in STD/HIV-DIS Prevention Services Program Grant