Department of Aviation
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
Location
View network map
Loading network map…
Activity Timeline
Showing 51–85 of 85October 2025
Authorization of a five-year service contract, with two one-year renewal options, for fingerprint-based criminal history record checks and security threat assessments for the Department of Aviation with Airport Research and Development Foundation dba Transportation Security Clearinghouse as the sole proposer, not to exceed $1,630,839.
Authorize a five-year service contract, with two one-year renewal options, for fingerprint based criminal history record checks and security threat assessments for the Department of Aviation - Airport
September 2025
Appoints Sarah Standifer as President, Ivan Guel as Vice-President, and Heather Estrada as Secretary to the Love Field Airport Modernization Corporation Board of Directors for two-year terms expiring September 30, 2027.
Consideration of the appointment of Sarah Standifer, Director - Dallas Water Utilities Department, as President, Ivan Guel, Assistant Director - Budget and Management Services, as Vice-President, and
The city authorizes rejection of all bids received for construction services for the Dallas Executive Airport Streetscape Enhancements Project, with no financial cost to the city.
Authorize the rejection of all bids received for solicitation CIZ25-AVI-3148 for construction services for the Dallas Executive Airport Streetscape Enhancements Project - Financing: No cost considerat
Authorizes Supplemental Agreement No. 2 with O'Brien Engineering for structural design and HVAC assessment services at Dallas Love Field Garages A and B, increasing the contract by $30,000 to a total of $334,900 and extending the term to December 31, 2026.
Authorize Supplemental Agreement No. 2 to the engineering services contract with O’Brien Engineering, Inc. to (1) provide structural design services to Garages A and B pedestrian concourse heating, ve
Authorizes Supplemental Agreement No. 1 with Satterfield and Pontikes Construction to add a deicing structure and electric vehicle charger to the Dallas Love Field Aircraft Rescue and Firefighting Station No. 21 project, increasing the contract by $1,573,483 to $32,406,738 and extending the term to March 31, 2026.
Authorize Supplemental Agreement No. 1 to the construction services contract with Satterfield and Pontikes Construction, Inc., to include a deicing structure and an X-Charge C7 charger for electric ve
A briefing on the outcomes and implications of the 89th Texas Legislature's post-session results, presented by the Department of Aviation.
89th Texas Legislature Post-Session Briefing
August 2025
Authorizes Supplemental Agreement No. 4 to increase a service contract with Convergint Technologies LLC by $225,488.41 for continued maintenance and support of the airport access control system at Dallas Love Field, bringing the total contract to $8,272,490.33.
…ort for the existing airport access control system at Dallas Love Field for the Department of Aviation - Not to exceed $225,488.41, from $8,047,001.92 to $8,272,490.33 - Financing: A…
The City seeks authorization to reject all bids received for the Garages A & B Repairs Project at Dallas Love Field and to re-advertise for new bids covering only the Garage B Repairs Project.
Authorize (1) the rejection of all bids received for solicitation CIZ25-AVI-3146 for construction services for the Garages A & B Repairs Project at Dallas Love Field; and (2) the re-advertisement for
City council is authorizing contracts with Casper Airport Solutions for noise monitoring terminal hardware and a five-year software license and maintenance agreement for the Noise and Operations Monitoring System and Flight Identification and Tracking System for the Department of Aviation, totaling up to $517,000.
…ntification and Tracking System in an amount not to exceed $497,000.00, for the Department of Aviation - Casper Airport Solutions, Inc. dba Casper Airport Solutions, only proposer -…
June 2025
Authorizes the Eighth Amendment to the lease with MLT Development Co. at Dallas Love Field, reducing the leased premises to construct a vehicle access road, adding approximately 2.35 acres with a building, and granting 24 additional months to expend $5,000,000 in capital improvements, with an estimated net revenue of $5,522,556.46 to the Aviation Fund.
Authorize the Eighth Amendment to the Lease of Land and Facilities with MLT Development Co. to (1) reduce the leased premises by approximately 16,576 square feet (0.38 acres) for the purpose of constr