Municue

Rochester Stormwater Pump Station

location
1 mention across 1 event
1 eventLast active Tracked since $13.3M city spending

Key facts

Money

$13.3M in total financial activity across agenda items that mention this location.

Largest single item: $13.3M on (Authorizes a construction services contract with Ruby Collins, Inc. to rehabilitate an existing 60-inch wastewater main from west of the East Branch of the Trinity River to near the Rochester…)

Topic Distribution

Topics

utilities (1)
transportation (1)
contract (1)

Roles

mentioned (1)
View network map

Loading network map…

Activity Timeline

September 2026

Consent Agenda

Authorizes a construction services contract with Ruby Collins, Inc. to rehabilitate an existing 60-inch wastewater main from west of the East Branch of the Trinity River to near the Rochester Stormwater Pump Station.

Authorize a construction services contract for the rehabilitation of an existing 60-inch diameter wastewater main located from west of the East Branch of the Trinity River to near the Rochester Stormw

$13.3M