Municue

GEI Consultants, Inc.

organization
2 mentions across 2 events
2 eventsLast active Tracked since $629K city spending

Key facts

Money

$629K in total financial activity across agenda items that mention this organization.

Largest single item: $629K on (Authorizes a professional services contract with GEI Consultants, Inc. for engineering design of three local streets (Gold Dust Trail, Windpiper Drive, Peyton Drive) under Street Project Group…)

Mention Frequency

Topic Distribution

Topics

utilities (2)
transportation (2)
contract (2)
bond (2)

Roles

vendor (2)
View network map

Loading network map…

Activity Timeline

October 2026

Consent Agenda
vendor

Authorizes a professional services contract with GEI Consultants, Inc. for engineering design of three local streets (Gold Dust Trail, Windpiper Drive, Peyton Drive) under Street Project Group 24-1201, not to exceed $628,588.70.

Authorize a professional services contract with GEI Consultants, Inc. to provide engineering services for the design of three local streets, 6500 Gold Dust Trail from Davenport Road to Levelland Road,

$629K

September 2026

Briefing Items
vendor

Authorizes a professional services contract with GEI Consultants, Inc. for engineering design services for three local streets in Street Project Group 24-1201, not to exceed $628,588.70, funded by 2024 General Obligation Bond street funds and water/wastewater capital improvement funds.

Authorize a professional services contract with GEI Consultants, Inc. to provide engineering services for the design of three local streets as part of Street Project Group 24-1201 (list attached to th