Key facts
- Latest action
· Transportation and Infrastructure Committee
Amount: $5.0M
- Money
$124.5M in total financial activity across agenda items that mention this department.
Largest single item: $42.1M on (Authorizes a construction services contract with Grey Sky Construction LLC, lowest responsible bidder of two, for the 2026 On-Call Paving Contract, financed by multiple city and DART funds subject…)
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
Location
View network map
Loading network map…
Activity Timeline
October 2026
Authorizes a three-year sole-source service price agreement with Wavetronix LLC for traffic detection radar equipment, software, parts, and repairs for the Department of Transportation and Public Works.
(26-3193A) Authorize a three-year service price agreement for traffic detection radar equipment, software, accessories, replacement parts, and repairs for the Department of Transportation and Public W
Briefing update on the Streetcar operations and maintenance study and the Central Link study from the Department of Transportation and Public Works.
Streetcar O&M and Central Link Studies Update [Ghassan Khankarli, Ph.D., P.E., Director of the Department of Transportation and Public Works]
Authorizes a three-year service price agreement with two one-year renewal options for median and right-of-way grounds maintenance for the Department of Transportation and Public Works with Good Earth Corporation, the most advantageous proposer of four.
…enewal options for median and right-of-way grounds maintenance services for the Department of Transportation and Public Works - Good Earth Corporation, most advantageous…
Authorizes a construction contract with Texas Standard Construction, Ltd., lowest responsible bidder of nine, to build two new traffic signals under the Bond Traffic Signal Construction - Group 7 Project, not to exceed $709,126.18.
Authorize a construction services contract for the Bond Traffic Signal Construction - Group 7 Project to construct two new traffic signals at the intersections of Illinois Avenue at Western Park and W
Authorizes a professional services contract with GEI Consultants, Inc. for engineering design of three local streets (Gold Dust Trail, Windpiper Drive, Peyton Drive) under Street Project Group 24-1201, not to exceed $628,588.70.
Authorize a professional services contract with GEI Consultants, Inc. to provide engineering services for the design of three local streets, 6500 Gold Dust Trail from Davenport Road to Levelland Road,
Authorizes a construction services contract with EARTC, lowest responsible bidder of seven, to build four new traffic signals under the 2024 Bond Traffic Signal Construction - Group 6 project.
Authorize a construction services contract for the 2024 Bond Traffic Signal Construction - Group 6 project to construct four new traffic signals at the intersections of Masters Drive at Checota Drive,
Authorizes a decrease in the construction services contract with EAR Telecommunications dba EARTC to remove traffic signal work at Whitehurst Way and Ferris Branch Boulevard, which no longer meets federal signal warrant requirements.
Authorize a decrease in the construction services contract with EAR Telecommunications, LLC dba EARTC to de-scope all traffic signal work associated with the intersection of Whitehurst Way and Ferris
September 2026
Authorizes a construction services contract with Grey Sky Construction LLC, lowest responsible bidder of two, for the 2026 On-Call Paving Contract, financed by multiple city and DART funds subject to annual appropriations.
Authorize a construction services contract for the 2026 On-Call Paving Contract - Grey Sky Construction LLC, lowest responsible bidder of two - Not to exceed $42,136,372.00 - Financing: ARPA Redevelop
Authorizes a professional services contract with Halff Associates, Inc. for engineering design of the Jefferson Complete Street from Hampton Road to Polk Street, funded by bond, water, and wastewater capital funds.
Authorize a professional services contract with Halff Associates, Inc. to provide engineering services for the design of Jefferson Complete Street from Hampton Road to Polk Street - Not to exceed $2,6
Authorizes an increase to the construction contract with Estrada Concrete Company for additional barrier free ramp and sidewalk improvements along DART bus routes.
Authorize an increase in the construction services contract with Estrada Concrete Company, LLC for the additional barrier free ramp and sidewalk improvements needed for the 2024 Barrier Free Ramp Impr