Mountain Creek Parkway
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
View network map
Loading network map…
Activity Timeline
June 2025
Public hearing to amend the City of Dallas Thoroughfare Plan by reclassifying Grady Niblo Road between Mountain Creek Parkway and Merrifield Road from a six-lane principal arterial (107-ft ROW) to a four-lane minor arterial (80-ft ROW), and to approve the designated alignment of the unbuilt portion of that roadway.
A public hearing to receive comments to (1) amend Ordinance No. 20860, “City of Dallas Thoroughfare Plan” to change the (1) designation of Grady Niblo Road between Mountain Creek Parkway and Merrifiel
March 2025
Amendment to the City of Dallas Thoroughfare Plan to downgrade Grady Niblo Road between Mountain Creek Parkway and S. Merrifield Road from a six-lane divided principal arterial (S-6-D, 107 ft ROW) to a four-lane divided minor arterial (M-4-D(A), 80 ft ROW) and revise the alignment of the unbuilt portion of the roadway.
An amendment to the City of Dallas Thoroughfare Plan to change (1) the designation of Grady Niblo Road between Mountain Creek Parkway and S. Merrifield Road from a standard six-lane divided principal