IEA, Inc.
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
Location
View network map
Loading network map…
Activity Timeline
September 2026
Authorizes engineering-services contracts for flood management, erosion control, and storm drainage improvements at 13 locations.
…Engineering, Inc. dba HDR, Inc., in an amount not to exceed $1,025,668.88, and IEA, Inc., in an amount not to exceed $803,500.93 - Total not to exceed $3,037,878.81 - F…
February 2026
Authorizes Supplemental Agreement No. 1 with IEA, Inc. expanding professional engineering services to cover additional FEMA-required hydraulic/hydrology studies, design of the Herndon Park Bridge, and retaining wall repair at Flagpole Hill Trail.
Authorize Supplemental Agreement No. 1 to the professional services contract with IEA, Inc. to provide engineering design and consulting services for an additional hydraulic and hydrology study to mee
September 2025
Authorization of a professional services contract with IEA, Inc. for engineering services to evaluate and design erosion control improvements at three locations, funded through the 2024 General Obligation Bond Fund and a Certificate of Obligation fund.
Authorize a professional services contract with IEA, Inc. to provide engineering services for the evaluation and design of erosion control improvements at three locations (list attached to the Agenda