February 2026

Consent Agenda

Authorizes Supplemental Agreement No. 1 with IEA, Inc. increasing the professional services contract by $250,960 to add engineering design services including a FEMA-required hydraulic/hydrology study for the Dixon Branch Greenbelt Pedestrian Bridge, design of Herndon Park Bridge, and retaining wall repair at Flagpole Hill Trail.

…hydrology study to meet Federal Emergency Management Agency requirement for the Dixon Branch Greenbelt Pedestrian Bridge Project located at 10305 Lippitt Avenue, design of Herndon Park Bridge located at 400 E…