M.E.P. Consulting Engineers, Inc.
Also known as: MEPCE
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
Location
View network map
Loading network map…
Activity Timeline
June 2026
Authorizes a professional services contract with Simon Engineering & Consulting, Inc. to design six local streets under Street Reconstruction Group 24-2001, funded by the 2024 General Obligation Bond Fund, Water, and Wastewater capital funds.
Authorize a professional services contract with Simon Engineering & Consulting, Inc. to provide engineering services for the design of six local streets as part of Street Reconstruction Group 24-2001
Authorization of a not-to-exceed $525,563.18 professional services contract with Simon Engineering & Consulting, Inc. for engineering design of six local streets under Street Reconstruction Group 24-2001, funded through the 2024 General Obligation Bond Fund and water/wastewater capital improvement funds.
Authorize a professional services contract with Simon Engineering & Consulting, Inc. to provide engineering services for the design of six local streets as part of Street Reconstruction Group 24-2001
Authorizes Supplemental Agreement No. 1 to increase the professional services contract with MEP Consulting Engineers, Inc. by $120,000 for design and construction administration services for replacing the indoor pool mechanical system at Bachman Recreation Center.
Authorize a Supplemental Agreement No. 1 to the professional services contract with MEP Consulting Engineers, Inc. for additional architectural and engineering services for the schematic design, desig
May 2026
Authorizes Supplemental Agreement No. 1 with MEP Consulting Engineers, Inc., increasing the professional services contract by $120,000 for additional architectural and engineering services for the indoor pool mechanical system replacement at Bachman Recreation Center.
Authorize a Supplemental Agreement No. 1 to the professional services contract with MEP Consulting Engineers, Inc. for additional architectural and engineering services for the schematic design, desig
April 2026
Authorization of Supplemental Agreement No. 1 with MEP Consulting Engineers Inc. for additional architectural and engineering services for the replacement of the indoor pool mechanical system at Bachman Recreation Center, increasing the contract by up to $150,000 (from $48,200 to $198,200), funded by the 2017 General Obligation Bond.
Authorize a Supplemental Agreement No. 1 to the professional services contract with MEP Consulting Engineers Inc. for additional architectural and engineering services for the schematic design, design
March 2025
Authorizes a professional engineering services contract with M.E.P. Consulting Engineers, Inc. for design and construction administration for the replacement and modernization of the emergency backup generator system at Dallas City Hall, funded by ARPA Redevelopment Fund.
…odernization of the emergency back-up generator system at Dallas City Hall with M.E.P. Consulting Engineers, Inc. (MEPCE), the most highly qualified proposer of two - Not to exceed $1,030,200.0…