Municue

Tyler Street/Sylvan Avenue Corridor Study

project
1 mention across 1 event
1 eventLast active Tracked since $1.5M city spending

Topic Distribution

Topics

contract (1)
transportation (1)
bond (1)

Roles

mentioned (1)
View network map

Loading network map…

Activity Timeline

April 2026

Consent Agenda

Council is asked to authorize a professional engineering services contract with Kimley-Horn and Associates, Inc., not to exceed $1,500,000, for design services covering multiple transportation improvements including a roundabout, warranted traffic signals, street restriping, a pedestrian hybrid beacon, signal upgrades, and a corridor study, funded through the 2017 and 2024 General Obligation Bond Funds in alignment with the Vision Zero Plan.

Authorize a professional engineering services contract with Kimley-Horn and Associates, Inc. to provide engineering design services for: a “Peanut” Roundabout at the Colorado/Sylvan/Tyler intersection

$1.5M