Temporary Concrete Batching Plant at E. Wheatland Road
View full legal title
An application for a new Specific Use Permit for a temporary concrete or asphalt batching plant limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of E. Wheatland Road, west of S. Lancaster Road. Staff Recommendation: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed is completed, whichever is earlier, subject to a site plan and conditions. Applicant: Greg Leveling / I-20 Landcaster Fund, LLC. Representative: David Pitcher. KFM Engineering and Design Planner: Lori Levy, AICP Council District: 8 Z-26-000053
Get notified on new hearings, votes, or status changes for this matter.
Actions
Showing all 4 actions. Filter by: , , , .
Confirm expiration clause for Wheatland Road concrete plant
Context: The case was labeled 'Temporary' and approved 'As Amended' by Council on June 24, 2026, so the specific expiration terms changed from the Plan Commission's June 11 version and haven't been independently confirmed.
Recommended: Get the specific reversion or expiration date written into the amended ordinance — temporary batching plant SUPs typically require the use to cease and the site to revert to its prior zoning by a fixed date. That clause is your enforcement hook if the operator continues past it.
Pull amended conditions for Wheatland Road concrete plant
Applies if: If pursuing a similar temporary batching plant permit nearby
Context: Council approved Z-26-000053 'As Amended' by an 11-0 vote on June 24, 2026, meaning the adopted conditions changed from the Plan Commission's June 11 recommendation.
Recommended: Pull the exact ordinance conditions adopted at the June 24 Council vote — since the case passed 'as amended,' the duration, hours, and buffer requirements likely differ from what Plan Commission recommended on June 11. Match those adopted terms if you're pursuing a similar temporary batching plant permit on this corridor, since this is the version that just cleared council 11-0.
Ask why Wheatland Road concrete plant passed unanimously
Context: The case appeared three times in the record (twice at Plan Commission June 11, once at Council June 24) and closed with a unanimous 11-0 'Approved As Amended' vote, a pattern worth checking against the hearing transcripts for the amendment content.
Recommended: Pull the June 24 Council transcript and the amendment text — concrete batching plants typically draw opposition over dust and truck traffic, yet this one passed 11-0 with no recorded dissent after Council changed the Plan Commission's June 11 version. Find out what the amendment traded away and whether anyone spoke against it at either hearing.
Check truck hours for Wheatland Road concrete plant permit
Context: Council approved the temporary batching plant 'As Amended' by an 11-0 vote on June 24, 2026, so the operating conditions residents can cite differ from what was proposed at the June 11 Plan Commission hearing.
Recommended: Request the adopted hours-of-operation and truck-route conditions from the amended ordinance — a batching plant means concrete trucks, noise, and dust on E. Wheatland Road. The amended terms, not the original application, set what's actually enforceable on your street now.
Key Entities
View relationship map
Loading relationship map…
Trust Proof
What we said then vs what happened next
We said (Jun 18, 2026):
Check June 11 concrete plant vote before council appeal window closes
What happened (Jun 24, 2026):
Approved As Amended
We said (Jun 18, 2026):
Identify anchor project driving E. Wheatland concrete plant
What happened (Jun 24, 2026):
Approved As Amended
We said (Jun 18, 2026):
Pull June 11 vote record before challenge window closes
What happened (Jun 24, 2026):
Approved As Amended
We said (Jun 4, 2026):
Get dust conditions added to E. Wheatland concrete plant
What happened (Jun 24, 2026):
Approved As Amended
We said (Jun 4, 2026):
Identify the construction project driving E. Wheatland plant
What happened (Jun 24, 2026):
Approved As Amended
Timeline
A public hearing to receive comments regarding an application for and an ordinance granting a new Specific Use Permit for a temporary concrete or asphalt batching plant, limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of East Wheatland Road, west of South Lancaster Road Recommendation of Staff: Approval with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed or completed, whichever is earlier, subject to a site plan and conditions Recommendation of CPC: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed or completed, whichever is earlier, subject to a site plan and conditions Z-26-000053 *In alignment with ForwardDallas.
An application for a new Specific Use Permit for a temporary concrete or asphalt batching plant limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of E. Wheatland Road, west of S. Lancaster Road. Staff Recommendation: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed is completed, whichever is earlier, subject to a site plan and conditions. Applicant: Greg Leveling / I-20 Landcaster Fund, LLC. Representative: David Pitcher. KFM Engineering and Design Planner: Lori Levy, AICP Council District: 8 Z-26-000053
An application for a new Specific Use Permit for a temporary concrete or asphalt batching plant limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of E. Wheatland Road, west of S. Lancaster Road. Staff Recommendation: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed is completed, whichever is earlier, subject to a site plan and conditions. Applicant: Greg Leveling / I-20 Landcaster Fund, LLC. Representative: David Pitcher / KFM Engineering and Design Planner: Lori Levy, AICP Council District: 8 Z-26-000053
Vote: 11 for, 0 against, 3 absent
recommend approval of new SUP for temporary concrete batching plant