An application for a new Specific Use Permit for a temporary concrete or asphalt batching plant limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of E. Wheatland Road, west of S. Lancaster Road. Staff Recommendation: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed is completed, whichever is earlier, subject to a site plan and conditions. Applicant: Greg Leveling / I-20 Landcaster Fund, LLC. Representative: David Pitcher. KFM Engineering and Design Planner: Lori Levy, AICP Council District: 8 Z-26-000053

Zoning CasecorridorSignificantCity Council, City Plan CommissionDistrict 8
A Specific Use Permit was sought for a temporary concrete batching plant on property zoned MU-2 Mixed-Use, located south of East Wheatland Road and west of South Lancaster Road. Temporary batching operations in mixed-use districts affect nearby land use and construction traffic patterns. The permit was approved as amended by the City Council on June 24, 2026.
3 eventsFirst seen Jun 11, 2026Last activity Jun 24, 2026Case ID: Z-26-000053
City Council: Approved As AmendedJun 24, 2026
Topics
development
permit
zoning
East Wheatland Road and South Lancaster Road·Show on Google Maps ↗

Get notified on new hearings, votes, or status changes for this matter.

Actions

Showing all 4 actions. Filter by: , , , .

Attorney
As of Jun 2026

Confirm expiration clause for Wheatland Road concrete plant

Context: The case was labeled 'Temporary' and approved 'As Amended' by Council on June 24, 2026, so the specific expiration terms changed from the Plan Commission's June 11 version and haven't been independently confirmed.

Recommended: Get the specific reversion or expiration date written into the amended ordinance — temporary batching plant SUPs typically require the use to cease and the site to revert to its prior zoning by a fixed date. That clause is your enforcement hook if the operator continues past it.

Source: City Council — Jun 24, 2026 →
Developer
As of Jun 2026

Pull amended conditions for Wheatland Road concrete plant

Applies if: If pursuing a similar temporary batching plant permit nearby

Context: Council approved Z-26-000053 'As Amended' by an 11-0 vote on June 24, 2026, meaning the adopted conditions changed from the Plan Commission's June 11 recommendation.

Recommended: Pull the exact ordinance conditions adopted at the June 24 Council vote — since the case passed 'as amended,' the duration, hours, and buffer requirements likely differ from what Plan Commission recommended on June 11. Match those adopted terms if you're pursuing a similar temporary batching plant permit on this corridor, since this is the version that just cleared council 11-0.

Source: City Council — Jun 24, 2026 →
Journalist
As of Jun 2026

Ask why Wheatland Road concrete plant passed unanimously

Context: The case appeared three times in the record (twice at Plan Commission June 11, once at Council June 24) and closed with a unanimous 11-0 'Approved As Amended' vote, a pattern worth checking against the hearing transcripts for the amendment content.

Recommended: Pull the June 24 Council transcript and the amendment text — concrete batching plants typically draw opposition over dust and truck traffic, yet this one passed 11-0 with no recorded dissent after Council changed the Plan Commission's June 11 version. Find out what the amendment traded away and whether anyone spoke against it at either hearing.

Source: City Council — Jun 24, 2026 →
Resident
As of Jun 2026

Check truck hours for Wheatland Road concrete plant permit

Context: Council approved the temporary batching plant 'As Amended' by an 11-0 vote on June 24, 2026, so the operating conditions residents can cite differ from what was proposed at the June 11 Plan Commission hearing.

Recommended: Request the adopted hours-of-operation and truck-route conditions from the amended ordinance — a batching plant means concrete trucks, noise, and dust on E. Wheatland Road. The amended terms, not the original application, set what's actually enforceable on your street now.

Source: City Council — Jun 24, 2026 →

Trust Proof

What we said then vs what happened next

We said (Jun 18, 2026):

Check June 11 concrete plant vote before council appeal window closes

What happened (Jun 24, 2026):

Approved As Amended

We said (Jun 18, 2026):

Identify anchor project driving E. Wheatland concrete plant

What happened (Jun 24, 2026):

Approved As Amended

We said (Jun 18, 2026):

Pull June 11 vote record before challenge window closes

What happened (Jun 24, 2026):

Approved As Amended

We said (Jun 4, 2026):

Get dust conditions added to E. Wheatland concrete plant

What happened (Jun 24, 2026):

Approved As Amended

We said (Jun 4, 2026):

Identify the construction project driving E. Wheatland plant

What happened (Jun 24, 2026):

Approved As Amended

Timeline

Vote
Approved As Amended

A public hearing to receive comments regarding an application for and an ordinance granting a new Specific Use Permit for a temporary concrete or asphalt batching plant, limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of East Wheatland Road, west of South Lancaster Road Recommendation of Staff: Approval with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed or completed, whichever is earlier, subject to a site plan and conditions Recommendation of CPC: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed or completed, whichever is earlier, subject to a site plan and conditions Z-26-000053 *In alignment with ForwardDallas.

Hearing
Agenda Ready

An application for a new Specific Use Permit for a temporary concrete or asphalt batching plant limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of E. Wheatland Road, west of S. Lancaster Road. Staff Recommendation: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed is completed, whichever is earlier, subject to a site plan and conditions. Applicant: Greg Leveling / I-20 Landcaster Fund, LLC. Representative: David Pitcher. KFM Engineering and Design Planner: Lori Levy, AICP Council District: 8 Z-26-000053

Hearing
Carried: 11 to 0

An application for a new Specific Use Permit for a temporary concrete or asphalt batching plant limited to a temporary concrete batching plant on property zoned MU-2 Mixed-Use District, on the south line of E. Wheatland Road, west of S. Lancaster Road. Staff Recommendation: Approval, with an expiration date of January 1, 2028, or when the infrastructure project for which the temporary concrete batching plant is needed is completed, whichever is earlier, subject to a site plan and conditions. Applicant: Greg Leveling / I-20 Landcaster Fund, LLC. Representative: David Pitcher / KFM Engineering and Design Planner: Lori Levy, AICP Council District: 8 Z-26-000053

Vote: 11 for, 0 against, 3 absent

recommend approval of new SUP for temporary concrete batching plant