Central Wastewater Treatment Plant

location
7 mentions across 7 events
The Central Wastewater Treatment Plant is a major wastewater treatment facility operated by Dallas Water Utilities that serves the Dallas metropolitan area. The plant treats wastewater and plays a critical role in maintaining public health and environmental safety for the region. It has received recognition from the National Association of Clean Water Agencies for its operational performance.
7 eventsLast active Tracked since $11.0M city spending

Mention Frequency

Topics

utilities (7)
contract (7)

Roles

mentioned (7)

Location

1500 South Westmoreland Road, Dallas, TX 75211·Show on Google Maps ↗
View network map

Loading network map…

Activity Timeline

March 2026

Consent Agenda

Emergency contract with Advanced Pipe Repair, Inc. to rehabilitate two 48-inch diameter influent pipelines at the Central Wastewater Treatment Plant, funded by the Wastewater Construction Fund.

Authorize an emergency services contract with Advanced Pipe Repair, Inc. for the rehabilitation of two 48-inch diameter influent pipelines at the Central Wastewater Treatment Plant - Not to exceed $43

$435K
Upcoming Agenda Items

Authorizes an emergency services contract with Advanced Pipe Repair, Inc. for the rehabilitation of two 48-inch diameter influent pipelines at the Central Wastewater Treatment Plant, not to exceed $434,547.00, financed by the Wastewater Construction Fund.

Authorize an emergency services contract for the rehabilitation of two 48-inch diameter influent pipelines at the Central Wastewater Treatment Plant - Advanced Pipe Repair, Inc. - Not to exceed $434,5

$435K

September 2025

Consent Agenda

Authorization to increase BAR Constructors, Inc.'s construction contract by up to $1,873,456.25 for additional sulfur dioxide piping and equipment replacement at the Central Wastewater Treatment Plant, raising the total contract value from $48,559,500.00 to $50,432,956.25.

…g sulfur dioxide piping and equipment for the sulfur dioxide evaporators at the Central Wastewater Treatment Plant - Not to exceed $1,873,456.25, from $48,559,500.00 to $50,432,956.25 - Financin…

$1.9M

June 2025

Consent Agenda

Authorizes a new professional services contract with Gresham Smith for engineering services for major maintenance improvements at the Central Wastewater Treatment Plant, not to exceed $2,996,569.

Authorize a professional services contract with Gresham Smith to provide engineering services associated with major maintenance improvements at the Central Wastewater Treatment Plant - Not to exceed $

$3.0M
Briefing Items

Authorizes a professional services contract with Gresham Smith for engineering services related to major maintenance improvements at the Central Wastewater Treatment Plant, financed through two wastewater capital funds.

Dallas Water Utilities Department: Authorize a professional services contract with Gresham Smith to provide engineering services associated with major maintenance improvements at the Central Wastewate

$3.0M

May 2025

Consent Agenda

Authorization of Supplemental Agreement No. 1 with Lockwood, Andrews & Newnam, Inc. to expand professional engineering services for non-potable water system improvements at the Central Wastewater Treatment Plant, increasing the contract by $1,109,430 to a new total of $4,506,430.

…start-up services associated with non-potable water system improvements at the Central Wastewater Treatment Plant - Not to exceed $1,109,430.00, from $3,397,000.00 to $4,506,430.00 - Financing:…

$1.1M
Briefing Items

Authorization of Supplemental Agreement No. 1 with Lockwood, Andrews & Newnam for additional engineering services for non-potable water system improvements at the Central Wastewater Treatment Plant, increasing the contract by $1,109,430 to a new total of $4,506,430.

…start-up services associated with non-potable water system improvements at the Central Wastewater Treatment Plant - Not to exceed $1,109,430.00, from $3,397,000.00 to $4,506,430.00 - Financing:…

$1.1M