Texas Department of Transportation
Also known as: TxDOT
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
Connected Matters
Legislative threads where Texas Department of Transportation is mentioned
Jefferson Boulevard Viaduct Phase II Engineering (25-2377A)
State Infrastructure Bank Loan Agreement (25-1694A)
Location
View network map
Loading network map…
Activity Timeline
Showing 1–50 of 96April 2026
Authorizes an Advance Funding Agreement with the Federal Highway Administration through TxDOT for a TASA Program project to construct the Cotton Belt Trail and Marni Kaner Trail, with total federal, state, and city funding of $6,410,386, of which the city's share is $63,400 from 2017 bond funds.
Authorize (1) an Advance Funding Agreement with the Federal Highway Administration through the Texas Department of Transportation (TxDOT) (Agreement No. CSJ 0918-47-564, Assistance Listing No. 20.205)
A briefing by TxDOT District Engineer Ceason Clemens covering Texas Department of Transportation project updates, with a specific focus on the I-345 corridor.
TxDOT Project Updates Including I-345 Briefing [Ceason Clemens, District Engineer, Texas Department of Transportation]
Authorizes a Project Specific Agreement with Dallas County for $24,125,000 to engineer and construct transportation improvements on Ross Avenue from US 75 to Greenville Avenue, with the City contributing $20,625,000 and the County $3,500,000; also authorizes a $3,450,000 appropriation increase and receipt of County reimbursement funds, with total City financing across multiple funds not to exceed $16,154,235.64.
…ound totaling $7,970,764.36 and includes associated federal funding through the Texas Department of Transportation Advance Funding Agreement in related agenda item on this meeting date, for engi…
Authorizes acceptance of a $12 million federal grant through TxDOT's Surface Transportation Block Grant Program to upgrade the Advanced Traffic Management System and construct emergency vehicle signal preemption improvements on Harry Hines Boulevard within a one-mile radius of Southwest Medical District.
Authorize the (1) acceptance of a grant from the U. S. Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation
Authorizes acceptance of a $1.2 million state grant through TxDOT's Regional Toll Revenue program for construction of intersection improvements on Arapaho Road at Dallas Parkway, including turn lane modifications, pedestrian crosswalk enhancements, and permanent traffic signal installation.
Authorize the (1) acceptance of a grant from the State of Texas through the Texas Department of Transportation (TxDOT) for the Regional Toll Revenue (RTR) State Highway (SH) 121 toll project (Agreemen
March 2026
Authorizes Amendment No. 1 to terminate a previously approved Advance Funding Agreement with TxDOT (Agreement No. CSJ 0918-47-514) for corridor improvements on Harry Hines Boulevard near the Southwest Medical District Project, at no cost to the city.
Authorize Amendment No. 1 to terminate the Advance Funding Agreement (AFA) authorized by Resolution No. 24-1640, previously approved on November 13, 2024, with the Texas Department of Transportation a
Authorizes Amendment No. 1 to the TxDOT Advance Funding Agreement for the Transportation Alternatives Set-Aside Program, increasing the total project cost by ~$1.95M (from $4.04M to $5.99M) for Ross Avenue construction improvements from Greenville Avenue to I-345, with increased federal participation and Transportation Development Credits substituting for additional local match.
Authorize Amendment No. 1 to the Advance Funding Agreement (AFA) (Agreement No. CSJ 0918-47-325, Assistance Listing No. 20.205) between the City of Dallas and the Texas Department of Transportation fo
Authorizes acceptance of a $30M TxDOT Regional Toll Revenue grant and $7.5M local match to construct a grade-separated 4-lane roadway with sidewalks and bicycle lanes on Herbert Street under the Union Pacific Railroad Line from Broadway Avenue to Commerce Street, with a total project cost of $37.5M through April 2028.
Authorize (1) the acceptance of a grant from the State of Texas through the Texas Department of Transportation (TxDOT) for the Regional Toll Revenue (RTR) State Highway (SH) 121 Toll Project (Agreemen
Amends Resolution No. 21-0612 for a TxDOT Advance Funding Agreement related to the U.S. Route 75/Greenville/Lovers Lane/Mockingbird Lane Project, correcting the local match amount from $880,928 down to $17,618.56 and authorizing disbursement of the $863,309.44 balance; no new cost to the city.
Authorize an amendment to Resolution No. 21-0612, previously approved on April 14, 2021, for an Advance Funding Agreement with the Texas Department of Transportation (TxDOT) (Agreement No. CSJ 0918-47
Authorizes Amendment No. 1 to the Advance Funding Agreement with TxDOT for the Transportation Alternatives Set-Aside Program project on Ross Avenue from Greenville to IH-345, increasing the total estimated project cost by $1,952,816.07 (from $4,037,312.43 to $5,990,128.50) through increased federal participation and the use of $1,140,000 in Transportation Development Credits in lieu of local match.
Authorize Amendment No. 1 to the Advance Funding Agreement (AFA) (Agreement No. CSJ 0918-47-325, Assistance Listing No. 20.205) between the City of Dallas and the Texas Department of Transportation fo