National Highway Traffic Safety Administration
Also known as: NHTSA
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
View network map
Loading network map…
Activity Timeline
May 2026
Authorizes acceptance of a $42,360 federal safety belt enforcement grant from NHTSA through TxDOT under the STEP Click It Or Ticket Mobilization program, with a $10,598.06 local General Fund match, for a total program cost of $52,958.06.
Authorize (1) the application for and acceptance of a grant from the National Highway Traffic Safety Administration through the Texas Department of Transportation (TxDOT) for the Selective Traffic Enf
Authorization to apply for and accept a $42,360 federal traffic safety grant from NHTSA via TxDOT for the STEP Click It Or Ticket safety belt enforcement initiative, with a $10,598.06 local General Fund match, for a total program cost not to exceed $52,958.06.
Authorize the (1) application for and acceptance of a grant from the National Highway Traffic Safety Administration through the Texas Department of Transportation (TxDOT) for the Selective Traffic Enf
September 2025
Authorize acceptance of a federal STEP Comprehensive 2026 grant from NHTSA through TxDOT in the amount of $840,132 for police traffic enforcement overtime and travel expenses, along with a required local cash match of $214,672.34 from the General Fund.
Authorize (1) the application for and acceptance of a grant from the National Highway Traffic Safety Administration through the Texas Department of Transportation (TxDOT) for the Selective Traffic Enf
May 2025
Authorization to apply for and accept a $40,062 NHTSA grant through TxDOT for the STEP Click It Or Ticket safety belt enforcement initiative (May 16–June 4, 2025), establish appropriations, and provide a $10,024.95 local cash match, for a total not to exceed $50,086.95.
Authorize the (1) application for and acceptance of a grant from the National Highway Traffic Safety Administration through the Texas Department of Transportation (TxDOT) for the Selective Traffic Enf
Authorization to apply for and accept a $40,062 NHTSA grant through TxDOT for the STEP Click It Or Ticket safety belt enforcement program, with a $10,024.95 local cash match, for a total program cost of $50,086.95 covering May 16–June 4, 2025.
Authorize the (1) application for and acceptance of a grant from the National Highway Traffic Safety Administration through the Texas Department of Transportation (TxDOT) for the Selective Traffic Enf