City Manager's Office
Also known as: CMO
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
Connected Matters
Legislative threads where City Manager's Office is mentioned
Charter School at Harry Hines & Wadley Lane (Z-25-000151)
Criado Engineering Services Supplement (26-1299A)
City Council Leadership Performance Review (26-311A)
Convention Center Expansion Plan (26-289A)
Convention Center Master Plan Component Update (25-1654A)
Location
View network map
Loading network map…
Activity Timeline
Showing 51–100 of 210March 2026
Construction services contract with Urban Infraconstruction, LLC, the lowest responsible bidder among five, for construction of Cockrell Hill Road from La Reunion Parkway to Singleton Boulevard, not to exceed $20,330,000, financed across four city funds including 2024B Certificates of Obligation.
Authorize a construction services contract for the construction of Cockrell Hill Road from La Reunion Parkway to Singleton Boulevard - Urban Infraconstruction, LLC, lowest responsible bidder of five -
Professional services contract with PMG Project Management Group, LLC for construction management, engineering, inspection, and design support services to assist the city in managing approximately 200 active projects under the citywide Traffic Signal Program, not to exceed $1,889,107.
Authorize a professional services contract with PMG Project Management Group, LLC., the most highly qualified proposer to provide construction management, engineering, and inspection services, and eng
Authorization to acquire drainage easements from St. Thomas Aquinas Catholic Parish near Alderson Street and Martel Avenue for the Alderson 3700 Storm Drainage Improvement Project in exchange for engineering design services valued up to $310,628.50, and to enter a Participation and Funding Agreement requiring the parish to fund additional construction improvements.
Authorize (1) an acquisition of two drainage easements containing a total of approximately 7,052 square feet of land, and one temporary construction easement of approximately 2,192 square feet of land
A briefing memo summarizing an interlocal agreement with Dallas Area Rapid Transit (DART) concerning a Strategic Funding Plan.
Summary of the Dallas Area Rapid Transit Strategic Funding Plan Interlocal Agreement [Dev Rastogi, Assistant City Manager; Jake Anderson, Interim Director, Government Affairs]
A briefing on the Jefferson Viaduct Study and Recommendation as part of the Kay Bailey Hutchison Convention Center Dallas Master Plan, presented jointly by the Directors of Tourism, Conventions and Events and Transportation & Public Works.
Kay Bailey Hutchison Convention Center Dallas (KBHCCD) Master Plan: Jefferson Viaduct Study and Recommendation [Rosa Fleming, Director, Tourism, Conventions, and Events; Gus Khankarli, Director, Trans
Authorizes a third supplemental agreement increasing the professional services contract with Garver, LLC by up to $585,628.50 for additional engineering services related to flood management and stormwater drainage improvements at two locations, bringing the total contract value to $1,385,358.50, financed by the 2017 General Obligation Bond Fund.
Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC to provide additional engineering services required for flood management and stormwater drainage improveme
Authorizes Supplemental Agreement No. 2 with Terracon Consultants, Inc. for additional engineering and architectural services covering roof and HVAC repairs/replacements and new elevator system assessments at various locations, increasing the contract by $229,000 to a new total of $2,165,480.
Authorize Supplemental Agreement No. 2 to the professional services contract with Terracon Consultants, Inc. to provide additional engineering and architectural services to complete roof and heating,
Quarterly briefing from Dallas Area Rapid Transit leadership, presented by DART Board Chair Randall Bryant and President & CEO Nadine S. Lee, updating the city on DART operations and initiatives.
Quarterly Dallas Area Rapid Transit Update [Randall Bryant, DART Board Chair & Nadine S. Lee, President & CEO- DART]
Authorizes a Project Specific Agreement with Dallas County designating the City of Dallas as lead agency to administer construction of Cockrell Hill Road from La Reunion Parkway to Singleton Boulevard, with up to $4,796,229.40 in county reimbursement funds to be received and appropriated.
Authorize (1) a new Project Specific Agreement (PSA) with Dallas County to designate the City of Dallas as the lead agency to administer construction for Cockrell Hill Road from La Reunion Parkway to
Authorizes an emergency services contract with Advanced Pipe Repair, Inc. for the rehabilitation of two 48-inch diameter influent pipelines at the Central Wastewater Treatment Plant, not to exceed $434,547.00, financed by the Wastewater Construction Fund.
Authorize an emergency services contract for the rehabilitation of two 48-inch diameter influent pipelines at the Central Wastewater Treatment Plant - Advanced Pipe Repair, Inc. - Not to exceed $434,5