Case File 26-1382A
Criado & Associates Engineering Services (26-1054A)
Pearl Street and Flora Street Intersection Improvements (25-2807A)
Street Resurfacing Contract Increase for FIFA World Cup (25-2610A)
Pearl and Flora Streets Intersection Improvements (25-3026A)
Jefferson Boulevard Viaduct Engineering Services (25-2666A)
DART Barrier-Free Ramp Improvements Amendment (25-2327A)
Jefferson Boulevard Viaduct Phase II Engineering (25-2377A)
Jefferson Boulevard Viaduct Modification Engineering (25-1515A)
Jefferson Boulevard Viaduct Modification Engineering Services (25-1808A)
Criado & Associates Engineering Services Supplement (25-1378A)
Location
View network map
Loading network map…
Activity Timeline
Showing 101–150 of 279December 2025
Authorizes a construction services contract with Texas Standard Construction, Ltd. to reconstruct two existing traffic signals and construct one new traffic signal at three Dallas intersections, funded through a mix of TxDOT grant funds, city transportation funds, and 2017 General Obligation bonds.
Authorize a construction services contract to reconstruct two traffic signals at Hampton Road at Leath Street and Ferndale Road at Walnut Hill Lane and construct one new traffic signal at Old Seagovil
Authorization of a three-year service price agreement with two renewal options for reflective lane striping services awarded to three vendors for a total estimated amount of $12,584,166.03, in alignment with the Vision Zero Plan.
Authorize a three-year service price agreement, with two one-year renewal options, for reflective lane striping services for the Department of Transportation and Public Works - The Confidence Group db
Authorization to enter into a reimbursement agreement with TxDOT for $567,113.70 in Highway Safety Improvement Program grant funds to cover material and labor costs for constructing traffic signals at six intersections and retiming adjacent signals, in alignment with the Vision Zero Plan.
Authorize (1) an agreement with the Texas Department of Transportation (TxDOT) through a 2022 Highway Safety Improvement Program grant from the U.S. Department of Transportation Federal Highway Admini
Authorize a professional services contract with Dunaway Associates, LLC for engineering design of the Bernal Trail Project from Tumalo Trail to Norwich Street, not to exceed $657,425, financed through the 2024 General Obligation Bond Fund.
Authorize a professional services contract with Dunaway Associates, LLC to provide engineering services for the design of the Bernal Trail Project from Tumalo Trail to Norwich Street - Not to exceed $
Authorization of Supplemental Agreement No. 4 to increase a professional engineering services contract with Bartlett & West, Inc. by $1,445,160.60 for additional preliminary engineering, subsurface utility engineering, and survey services for Park Lane and Fair Oaks Avenue roadway modifications, funded by the Park Lane-Vickery Meadows Project Grant Fund.
Department of Transportation and Public Works: Authorize Supplemental Agreement No. 4 to the professional engineering services contract with Bartlett & West, Inc., formerly known as Civil Associates,
Authorization to increase the construction services contract with Tiseo Paving Company by $327,484.35 for additional bridge and water main improvements on Canada Drive and South Canada Drive, bringing the total contract to $23,968,453.20, financed by the 2017 GO Bond Fund and Water Capital Improvement G Fund.
Department of Transportation and Public Works: Authorize an increase in the construction services contract with Tiseo Paving Company for the additional bridge and water main improvements needed for th
Authorizes a five-year maintenance agreement (with an option for a two-year renewal) with the Ferguson Road Initiative for maintenance and operation of four monuments at the intersections of Ferguson Road with Lakeland Drive and Highland Road, at no cost to the City.
Department of Transportation and Public Works: Authorize a five-year Maintenance Agreement with the option to renew for an additional two-year term upon expiration with the Ferguson Road Initiative fo
Authorizes a $567,113.70 agreement with TxDOT through a 2022 Highway Safety Improvement Program grant for cost reimbursement for traffic signal construction at six intersections, and establishes appropriations and receipt of funds in the designated reimbursement fund.
Department of Transportation and Public Works: Authorize (1) an agreement with the Texas Department of Transportation (TxDOT) through a 2022 Highway Safety Improvement Program grant from the U.S. Depa
Authorization of a construction services contract with Axis Contracting, Inc., the lowest of six responsible bidders, for Complete Street Improvements on Columbia Avenue/Main Street from South Beacon Street to Deep Ellum, not to exceed $16,064,841.80 funded across multiple city and bond funds.
Department of Transportation and Public Works: Authorize a construction services contract for Complete Street Improvements on Columbia Avenue/Main Street from South Beacon Street to Deep Ellum - Axis
Authorization of a professional services contract with Dunaway Associates, LLC for engineering design of the Bernal Trail Project from Tumalo Trail to Norwich Street, not to exceed $657,425, funded by the 2024 General Obligation Bond Fund.
Department of Transportation and Public Works: Authorize a professional services contract with Dunaway Associates, LLC to provide engineering services for the design of the Bernal Trail Project from T