City of Dallas Department of Transportation and Public Works
Also known as: TPW
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
Connected Matters
Legislative threads where City of Dallas Department of Transportation and Public Works is mentioned
Case File 26-1382A
Criado & Associates Engineering Services (26-1054A)
Pearl Street and Flora Street Intersection Improvements (25-2807A)
Street Resurfacing Contract Increase for FIFA World Cup (25-2610A)
Pearl and Flora Streets Intersection Improvements (25-3026A)
Jefferson Boulevard Viaduct Engineering Services (25-2666A)
DART Barrier-Free Ramp Improvements Amendment (25-2327A)
Jefferson Boulevard Viaduct Phase II Engineering (25-2377A)
Jefferson Boulevard Viaduct Modification Engineering (25-1515A)
Jefferson Boulevard Viaduct Modification Engineering Services (25-1808A)
Criado & Associates Engineering Services Supplement (25-1378A)
Location
View network map
Loading network map…
Activity Timeline
Showing 151–200 of 295October 2025
Authorizes an increase of $4,400,000 to the construction services contract with Viking Construction, LLC for the 2024 Two Year Term Agreement Slurry Seal and Polymer Modified Micro-Surfacing Contract, raising the total from $17,604,618 to $22,004,618.
Department of Transportation and Public Works: Authorize an increase in the construction services contract with Viking Construction, LLC for the additional funding needed to complete the 2024 Two Year
A multi-department briefing on policies and procedures related to extraordinary neighborhood events, involving Code Compliance Services, Dallas Police Department, Transportation and Public Works, and Planning and Development.
Extraordinary Neighborhood Events [Christopher Christian, Director, Code Compliance Services; Jeremy Reed, Director, Code Compliance Services; Major Pollyanna Ashford, Major of Police, Dallas Police D
Authorizes an Advance Funding Agreement with TxDOT for a $3,622,454.12 federal Highway Safety Improvement Program grant to construct traffic signal improvements at four locations, with the City bearing an estimated $200,000 for design costs and overruns.
Authorize an Advance Funding Agreement with the Texas Department of Transportation in the amount of $3,622,454.12 for a U.S. Department of Transportation Federal Highway Administration 2023 Highway Sa
Authorizes an agreement with TxDOT for a $662,218.50 Highway Safety Improvement Program grant to reimburse the City for construction of traffic signals at six intersections along Lancaster Road, Ledbetter Drive, and Robert B Cullum Boulevard, and establishes corresponding appropriations.
Authorize (1) an agreement with the Texas Department of Transportation (TxDOT) through a 2022 Highway Safety Improvement Program grant from the U.S. Department of Transportation Federal Highway Admini
September 2025
Construction services contract awarded to Texas Standard Construction, Ltd. to construct two new traffic signals at Chrysalis Drive/Wheatland Road and Red Bird Lane/Pastor Bailey Drive, funded by 2024 General Obligation Bonds.
Authorize a construction services contract for the 2024 Bond Traffic Signal Construction – Group 1 Project to construct two new traffic signals at the intersections of Chrysalis Drive at Wheatland Roa
Amendment No. 1 to the Advance Funding Agreement between the City and TxDOT for the Uptown McKinney/Cole Couplet (McKinney Avenue/Cole Avenue Two-way Conversion), increasing the total estimated project cost by ~$30M to ~$51M with revised federal, state, and local funding participation shares.
Authorize Amendment No. 1 to the Advance Funding Agreement (CSJ No. 0918-47-286, Assistant Listing No. 20.205) between the City of Dallas and the Texas Department of Transportation (TxDOT) for the Upt
Authorizes a construction services contract with EAR Telecommunications, LLC (EARTC) to construct two new traffic signals at the intersections of Matilda Road at University Boulevard and Jim Miller Road at Piedmont Drive, not to exceed $689,971.00, funded by the 2024 General Obligation Bond Fund.
Authorize a construction services contract for the 2024 Bond Traffic Signal Construction – Group 3 Project to construct two new traffic signals at the intersections of Matilda Road at University Boule
Amendment No. 1 to the Advance Funding Agreement with TxDOT for intersection improvements at Carbondale Street and Great Trinity Forest Way, reallocating existing project funding from the construction phase to the engineering phase at no new cost to the city.
Authorize Amendment No. 1 to the Advance Funding Agreement (Agreement No. CSJ 0581-01-157, Assistance Listing No. 20.205) between the City of Dallas and the Texas Department of Transportation for prel
Authorizes a construction services contract with EAR Telecommunications, LLC (EARTC) to construct two new traffic signals at the intersections of McCree Road at Plano Road and Whitehurst Way at Ferris Branch Boulevard, not to exceed $809,580.00, funded by the 2024 General Obligation Bond Fund.
Authorize a construction services contract for the 2024 Bond Traffic Signal Construction - Group 4 Project to construct two new traffic signals at the intersections of McCree Road at Plano Road and Wh
Authorizes Supplemental Agreement No. 10 with Wiss, Janney, Elstner Associates, Inc. for continued engineering, construction inspection, and bridge monitoring services under the Bridge Management Program in support of the Infrastructure Management Plan, increasing the contract by $351,000.00 to a new total of $2,384,921.00.
Authorize Supplemental Agreement No. 10 to the engineering contract with Wiss, Janney, Elstner Associates, Inc. to continue with the development of the Bridge Management Program in support of the Infr