Garver, LLC
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
View network map
Loading network map…
Activity Timeline
May 2026
Authorization to amend an engineering services contract with Garver, LLC to add construction administration services for the Taxiway Apron Paved Islands Phase I at Dallas Executive Airport, increasing the contract by $129,200 to a new total not-to-exceed of $353,150.
Authorize Supplemental Agreement No. 1 to the engineering services contract with Garver, LLC, to amend the scope of work to include construction administration services to the Taxiway Apron Paved Isla
March 2026
Authorizes a third supplemental agreement to increase a professional services contract with Garver, LLC for additional engineering services for flood management and stormwater drainage improvements at two locations, increasing the contract from $799,730.00 to $1,385,358.50, financed by the 2017 General Obligation Bond Fund.
Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC to provide additional engineering services required for flood management and stormwater drainage improveme
Authorizes a third supplemental agreement increasing the professional services contract with Garver, LLC by up to $585,628.50 for additional engineering services related to flood management and stormwater drainage improvements at two locations, bringing the total contract value to $1,385,358.50, financed by the 2017 General Obligation Bond Fund.
Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC to provide additional engineering services required for flood management and stormwater drainage improveme
April 2025
Authorizes a supplemental agreement with Garver, LLC increasing their professional services contract by up to $4,806,075.38 for additional engineering services for improvements to the Lake June Pump Station and Reservoir, bringing the total contract value to $8,205,897.38.
Authorize Supplemental Agreement No. 1 to the professional services contract with Garver, LLC to provide additional engineering services for improvements to the Lake June Pump Station and Reservoir -
January 2025
Authorizes an engineering services contract with Garver, LLC to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport, not to exceed $223,950 funded from the Aviation Construction Fund.
Authorize an engineering services contract with Garver, LLC to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport - Not to exceed $223,950.0
Engineering services contract with Garver, LLC not to exceed $223,950 to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport, financed by the Aviation Construction Fund.
Department of Aviation: Authorize an engineering services contract with Garver, LLC to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport No