Garver, LLC
Mention Frequency
Topic Distribution
Topics
Roles
Related Entities
View network map
Loading network map…
Activity Timeline
March 2026
Authorizes a third supplemental agreement to expand Garver, LLC's professional services contract for engineering work related to flood management and stormwater drainage improvements at two locations, increasing the contract ceiling by $585,628.50 to a new total of $1,385,358.50, funded by the 2017 General Obligation Bond Fund.
Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC to provide additional engineering services required for flood management and stormwater drainage improveme
Authorizes a supplemental agreement expanding a professional services contract with Garver, LLC for additional engineering services for flood management and stormwater drainage improvements at two locations, increasing the contract by $585,628.50, funded by the 2017 General Obligation Bond Fund.
Authorize Supplemental Agreement No. 3 to the professional services contract with Garver, LLC to provide additional engineering services required for flood management and stormwater drainage improveme
April 2025
Authorizes a supplemental agreement with Garver, LLC increasing their professional services contract by up to $4,806,075.38 for additional engineering services for improvements to the Lake June Pump Station and Reservoir, bringing the total contract value to $8,205,897.38.
Authorize Supplemental Agreement No. 1 to the professional services contract with Garver, LLC to provide additional engineering services for improvements to the Lake June Pump Station and Reservoir -
January 2025
Authorizes an engineering services contract with Garver, LLC to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport, not to exceed $223,950 funded from the Aviation Construction Fund.
Authorize an engineering services contract with Garver, LLC to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport - Not to exceed $223,950.0
Engineering services contract with Garver, LLC not to exceed $223,950 to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport, financed by the Aviation Construction Fund.
Department of Aviation: Authorize an engineering services contract with Garver, LLC to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport No